TOPRE

CULMAN, AL
 
Cardinal worked with Sankyu USA, Kajima International and Hitachi Zosen Fukui Corporation to install a four press tandem line comprised of three 1,000-ton transfer press units, one 1,500-ton blanker, a complete stack loader system, a wash unit, ten robots, transfer conveyors, and automation.
 
The installation also included the soleplate installation, fabrication and installation of the pit steel, the bolster steel and rails, and the multi-pit steel plate covers.
 
Additionally, Cardinal was responsible for subcontracting the installation of the interconnect wiring, the multi-press cable tray system, the field fabrication of the high pressure air system, the hydraulic system and the pneumatic interconnects.
Cardinals 500-ton gantry system, with a 35-foot vertical lift, is used to install the crown on this F press.