CHEMICAL & PHARMACEUTICAL

  • Machinery Installation
  • Mechanical Installation
  • Tanks
  • Steel Fabrication
  • Material Testing Equipment
  • Packaging Equipment
At Lilly headquarters, this 75-ton transformer was installed with the use of a 20-ton mobile crane and 400-ton hydraulic gantry system.
Cardinal also provided Lilly with the heavy-haul services to ensure a seamless and efficient installation.